(303) 746-7780
About BrooksBTA

Multi-Family Low Voltage Consultants

Denver, Colorado

Our Story

Built on a Simple Idea

“I started BrooksBTA after watching the same problem repeat itself for over a decade: low voltage technology was the last thing anyone planned and the first thing that caused headaches at move-in.”

Scopes were incomplete. Budgets were guesses. And owners paid for it in change orders, delays, and buildings that opened without the technology they needed.

I built this firm around one idea — that building technology deserves the same level of planning, design discipline, and project oversight as any other critical building system. Today, our team of RCDD-credentialed designers, certified project managers, and construction-tested advisors brings that discipline to every project we touch.

— Clayton Spencer, Managing Principal

Low voltage design plans reviewed on a tablet alongside a hard hat
Early Engagement

Why Involve BrooksBTA Early in Construction?

The earlier we’re engaged, the more value we deliver. Here’s what early technology planning prevents.

Saving Money

Early technology planning prevents the 10-15% change order increases that plague projects where low voltage systems are an afterthought. By defining scopes, validating budgets, and coordinating with the design team before construction starts, we eliminate the most common sources of cost overruns.

Preventing Delays

Uncoordinated technology systems are one of the top causes of construction delays in multi-family projects. When pathway conflicts, missing infrastructure, or carrier coordination issues are discovered during construction, the schedule impact cascades across every trade. Early engagement prevents these discoveries.

Avoiding Scope Gaps

The gap between what’s designed and what’s actually needed is where change orders live. BrooksBTA’s coordinated design process ensures every low voltage system is fully documented, properly specified, and aligned with the rest of the building design — leaving no room for scope surprises.

What We Believe

Our Principles

We believe building technology deserves the same rigor as structural engineering, the same coordination as MEP systems, and the same accountability as any other critical building discipline.

We believe independence matters. When your consultant doesn’t sell products or install systems, their recommendations are built on what’s right for your project — not what’s profitable for their business.

We believe the best projects are the ones where technology is planned first and installed last — not the other way around.

Testimonials

Trusted by Industry Leaders

Clayton and his team at Brooks have become a trusted extension of our development and asset management team. They have advised us on everything from ground-up IT design for new multifamily construction, to negotiating bulk internet agreements, acquisition-level infrastructure evaluations, and implementing LoRaWAN IoT temperature monitoring systems across properties. Their technical depth, responsiveness, and reliability set them apart. When Brooks is involved, I know the project will be executed correctly and that no critical component will fall by the wayside. They operate with the professionalism and accountability of an in-house partner.
Steve DanielFounding Partner, Blueline Equity Partners

Ready to Discuss Your Project?

Schedule a 30-minute introductory call to understand your scope, timeline, and technology goals.

Schedule a Call